Laboratory Test Sheet
                                                            Consolidation Test
Client :                                                                           Site :
Alfred McAlpine Civil Engineering
Stanton North Phase II
Client Ref :                              LabRef :                              Job No :                                          Date Received :
12345
10073
04/09/1996
B4240/96V
Supplier :                                                                      Source :
Material Type :                                                                 Specification :
Type 1 Sub-base
Sub-base
Material Name :                                                                 Stone Type :
Not Known
Type 1 Sub-base
Moisture Content (from trimmings)     %
Final Specimen
Moisture Content (measured)          %
Height of Solids                    Hs mm
Water                         g
Degree of Saturation                     %
Dry Soil                         g
Voids Ratio      
Wet Soil                         g
Dry Density                         Mg/m3
Ring Tray                         g
Density                         Mg/m3
Dry Soil ring tray                    g
Wet Soil Ring Tray                    g
(a)
mo
Initial Specimen
Weighings
Height          H     mm
Area          A     mm2
Diameter     D     mm
Preparation Method
(b)
Specimen
Change
(c)
Specimen
Specimen
Dimension
Final
Overall
Ho
Initial
Mean daily Temperature C
Increment no./dat started
Load kg/lb*pressure kPa
Clock
Time
t
h
Gauge
s
Reading
Elapsed Time
Cumulative
m
Compression
tmin
%mm dH
 
Volume          V     cm3
mo
md
Wo
eo
So
md
Delete as appropriate
(aUsing moisture content from trimmings
(bUsing data from (aand (c)
(cData from specimen after test
Test Method                         BS 1377 : Part 5 : 1990
Machine No.
Cell No.
Ring No.
Specimen Diameter                         mm
Lever Ratio                                   :1
kg/lb on hanger give pressure of
Height                    mm
Area                    mm2
kPa
Clock
Time
Gauge
Reading
Cumulative
Compression
Clock
Time
Gauge
Reading
Cumulative
Compression
%mm dH
%mm dH
Cumulative correction  y
Net cumulative
Compression   (dH y)
Comments :
Tested By :                                        Date :                         Checked By :                              Date :
                                                                                Check Level (1/2/3)
Notes :          Delete as applicable