Laboratory Test Sheet
MOISTURE CONDITION VALUE BS 1377 PART 1990
Method 5.5.5*
of
Page
Client :
Alfred McAlpine Civil Engineering
Change in Penetration
Penetration
Total No
Site :
Stanton North Phase II
(mm)
of Blows n
n to 4(mm)
Client Ref. :
10073
12345
Lab.  Ref. :
1
Job No.
Date Received :
04/09/1996
B4240/96V
2
Material Type :
Sub-base
4
Material Name :
Type 1 Sub-base
6
Soil Assessment :     Cohesive/Non-Cohesive* - Fine/Med. /CoarseGrained Soil
8
Sample Prep. :          Natural/Air Dried/Oven Dried at 50°c*
12
Sample Type :          Single/MultipleSamples
16
24
Specimen Moisture Content Data
32
Tin No.
48
Tin Weight (g)
64
Tin Wet Weight (g)
96
Tin Dry Weight (g)
1
128
Moisture Content %
192
256
NUMBER OF BLOWS
1
48
64
32
16
12
8
6
4
3
2
24
C
25
H
A
N
G
20
E
I
N
15
P
E
N
E
T
10
R
A
T
I
O
N
M
M
12
18
16
10
8
6
4
2
0
14
MOISTURE CONDITION VALUE
MCV :
Comments :
Date :
Tested By :
Checked By :
Date :
Check Level (3)*
Notes :     * - Delete as applicable                              1 - Use Final Dry Wtfrom moisture content constant weight check sheet form over page as applicable